Hi, when i setup a proxy redirection AND want the http to https redirection too, the latter is not taken because it appears last in vhost file. The sequence should be : 1- disallow letsencrypt redirection 2- do http -> https redirection 3- do proxy redirection Now the 2 last items are swapped. Ciao Max